Home   Events   Newsletter   Library   Classifieds   Gallery   Links   Contact Us   Join RWS  FAQs

 

David Ellsworth Workshop

Click on thumbnail for full size image

David continues hollowing the vessel
The reason why the hole for the cutting bit is below center - to put the cutting edge at center
Davids plan for the base of the hollow vessel
The base is shaped and it is parted off

David cuts out the nubbin to allow for the use of the center
The jam chuck is relieved a bit to allow for the top of the vessel
The vessel will be held in the same manner as the bowl
A foam pad on the top of the vessel placed in the recess in the jam chuck

The exact center is located and the bottom of the vessel is turned
The nubbin is removed as the last step in completing the hollow vessel
David talks a little about finishes or the lack of
The group takes a short break with David answering more questions

As a finale, David does a natural edge bowl from start to finish at real speed
Doing it with a minimum of explanation, David does the outside shape
Then the inside is rough hollowed
The walls are progressively thinned

David gets it thin enough to read through
The last inside finishing cut
It is jam chucked on the foam with the tailstock up to finish the foot
In less than 20 minutes, start to finish, a paper thin, natural edged bowl
Go to page 1
Go to page 2
Go to page 3
       
Photos by Kurt Hertzog
     

 

 


Home   Events   Newsletter   Library   Special Interest Groups    Join RWS
Classifieds   Gallery   Links   Members   Archives   Sponsors
 

Questions or comments? Check our FAQs or Contact us
Rochester Woodworkers Society, Inc. Ó 2000-2008
This page last updated on 07/10/2008   RWS ByLaws   
Privacy Statement   Editorial Policy   Website Credits